Ford Sierra

1982-1993 of release

Repair and operation of the car



Ford Siyerra
+ 1.2. Identification of the car
+ 2. Maintenance
+ 3. General data
- 4. Engines
   - 4.1. Petrol engines
      + 4.1.1. Technical characteristics
      4.1.2. Adjustment of gaps of valves
      + 4.1.3. System of ignition
      + 4.1.4. Fuel system
      + 4.1.5. The repair which is not demanding removal of the engine
      4.1.6. Removal and installation of the engine
      4.1.7. Dismantling of the engine
      4.1.8. Identification of the interacting parts
      4.1.9. Assembly of the engine
      4.1.10. Replacement of pistons
      4.1.11. Removal and installation of an intermediate shaft
      4.1.12. System of gas distribution
      4.1.13. Lubrication system
      - 4.1.14. Cooling system
         4.1.14.1. Discharge of liquid and filling of the cooling system
         4.1.14.2. Removal and installation of a radiator
         4.1.14.3. Removal and installation of the fan
         4.1.14.4. Pump of okhladzhayushchy liquid
         4.1.14.5. Replacement of the thermostat
      4.1.15. Suspension bracket of the power unit
      4.1.16. System of production of the fulfilled gases
   + 4.2. Diesel engine
+ 5. Coupling
+ 6. Transmissions
+ 7. Driveshaft and back bridge
+ 8. Steering
+ 9. Suspension brackets
+ 10. Brake system
+ 11. Body
+ 12. Electric equipment


a773976c



4.1.14.4. Pump of cooling liquid

GENERAL INFORMATION

Bolts of fastening of the pump


Removal

PERFORMANCE ORDER
1. To disconnect a wire of weight from the accumulator and to merge liquid from the cooling system.
2. To remove a radiator and the fan.
3. To disconnect the elastic pipeline conducting to a heater from the pump of cooling liquid.
4. To remove a casing of a gear belt.
5. To remove the elastic pipeline of cooling liquid between the pump of the cooling zhtdkost and a radiator.
6. To unscrew 3 bolts of fastening of the pump of cooling liquid and to completely take the pump.

Repair

PERFORMANCE ORDER
1. To remove a pump drive pulley by means of a press.
2. To take from a pump housing pump shaft knot with consolidation, the precision bearing and a rotor.
3. To remove a sealant from a shaft of the pump and to take the precision bearing from a pump housing.
4. By means of a ring and a shaft of the corresponding diameter and length to move a pump pulley nave on a pump shaft so that the end of a shaft acted on 1,5 mm over an external surface of a nave.
5. To install a new sealant on a shaft of the pump and in deepening in the case.
6. To establish on a pump shaft its rotor so that the gap between its blades and a pump housing made 0,8 mm.

Installation

PERFORMANCE ORDER
1. To clear the surfaces of connection of a pump housing and the block of cylinders of the engine.
2. To install the pump together with new laying on the block of cylinders.
3. To establish a casing of a gear belt.
4. To connect the elastic pipelines connecting the pump to a radiator and the heater to the pump of cooling liquid.
5. To establish a radiator and the fan.
6. To adjust a tension of a maple belt (1 – a bolt of the tension device, And – a belt deflection (And = 10 mm)).
7. To fill the cooling system, to connect the accumulator and to check tightness and functioning of the cooling system. In case of need to add the level of cooling liquid.