Ford Sierra

1982-1993 of release

Repair and operation of the car



Ford Siyerra
+ 1.2. Identification of the car
+ 2. Maintenance
+ 3. General data
- 4. Engines
   - 4.1. Petrol engines
      + 4.1.1. Technical characteristics
      4.1.2. Adjustment of gaps of valves
      + 4.1.3. System of ignition
      + 4.1.4. Fuel system
      + 4.1.5. The repair which is not demanding removal of the engine
      4.1.6. Removal and installation of the engine
      4.1.7. Dismantling of the engine
      4.1.8. Identification of the interacting parts
      4.1.9. Assembly of the engine
      4.1.10. Replacement of pistons
      4.1.11. Removal and installation of an intermediate shaft
      4.1.12. System of gas distribution
      4.1.13. Lubrication system
      - 4.1.14. Cooling system
         4.1.14.1. Discharge of liquid and filling of the cooling system
         4.1.14.2. Removal and installation of a radiator
         4.1.14.3. Removal and installation of the fan
         4.1.14.4. Pump of okhladzhayushchy liquid
         4.1.14.5. Replacement of the thermostat
      4.1.15. Suspension bracket of the power unit
      4.1.16. System of production of the fulfilled gases
   + 4.2. Diesel engine
+ 5. Coupling
+ 6. Transmissions
+ 7. Driveshaft and back bridge
+ 8. Steering
+ 9. Suspension brackets
+ 10. Brake system
+ 11. Body
+ 12. Electric equipment


a773976c



4.1.14.2. Removal and installation of a radiator

GENERAL INFORMATION

Cooling system

 
1 – radiator,
2 – broad tank,
3 – pump of cooling liquid,
4 case of the thermostat,
5 – thermostat,
6 – elastic pipelines

Removal

PERFORMANCE ORDER
1. To disconnect a wire of weight from the accumulator and to merge cooling liquid from the cooling system.
2. To disconnect the electric wires connecting the cooling system to the engine.
3. To disconnect the elastic pipeline from a broad tank.
4. In the cars equipped with the automatic transmission to disconnect elastic pipelines from a radiator of oil of the automatic transmission.
5. To remove an internal casing of a radiator.
6. To unscrew bolts of the top fastening a radiator.
7. To raise the car, to unscrew bolts of the lower fastening of a radiator and to take it.

Installation

PERFORMANCE ORDER
1. For installation of a radiator it is necessary to perform operations in the return sequence in relation to process of its removal.
2. After installation of pipelines of the cooling system it is necessary to fill system with cooling liquid and to remove from it air.
3. In the cars equipped with the automatic transmission it is necessary to check in addition oil level in the transmission.