Ford Sierra

1982-1993 of release

Repair and operation of the car



Ford Siyerra
+ 1.2. Identification of the car
+ 2. Maintenance
+ 3. General data
+ 4. Engines
+ 5. Coupling
+ 6. Transmissions
- 7. Driveshaft and back bridge
   7.1. Technical characteristics
   7.2. Removal and installation of the driveshaft
   7.3. Repair of the intermediate bearing
   7.4. Removal and installation of the back bridge
   7.5. Dismantling and assembly of the back bridge
   7.6. Dismantling and assembly of differential
   7.7. Adjustment of bearings of gear wheels of the main transfer
   7.8. Adjustment of gear wheels of the main transfer
   7.9. Assembly and adjustment of the main transfer
   7.10. Replacement of a sealing ring of a gear wheel of the main transfer
   + 7.11. Half shafts
+ 8. Steering
+ 9. Suspension brackets
+ 10. Brake system
+ 11. Body
+ 12. Electric equipment


a773976c



7.9. Assembly and adjustment of the main transfer

PERFORMANCE ORDER
1. To install bearings on a differential box, observing a former arrangement of the interacting elements.
2. To establish new laying of round section, and also new sealing rings (adaptation 15.076) on a flange of adjustment of a gap of bearings.
3. To oil bearings of a box of differential of the same type, as for the back bridge.
4. To establish differential, and also flanges of adjustment of a gap of bearings and to screw up them a hand in order that bearings became into place.
5. After performance (hand) of several tens turns by a gear wheel of the main transfer (for laying of conic bearings of a box of differential) gear wheels of the main transfer have to be so adjusted that the gap was almost not felt.
6. To establish the holder of the indicator of hour type on a differential box, and to rest its measuring tip at right angle against one of teeths of the conducted gear wheel of the main transfer.
7. To tighten a flange of adjustment of a gap of the bearing of a box of differential from the conducted gear wheel of the main transfer and to weaken the flange of adjustment of a gap of the bearing located on the opposite side so that to receive a mezhzubyevy gap of the main transfer of equal 0,05 mm.
8. To screw up a flange of adjustment of a gap of the bearing from differential on 4–5 teeths.
9. To turn, repeatedly a gear wheel of the main transfer and to measure mezhzubyevy a gap in three places of the conducted gear wheel of the main transfer (approximately everyone 120 °).
10. To establish clamps (from unscrewing) flanges of adjustment of a gap of bearings
11. To establish a cover of a case of the back bridge together with new laying, and also the plate with identification data.